
Storm Drain Rehabilitation
Owner
City of Chula Vista
Project
$10.6M
Constructed in two phases, improvements included repairing 19,600 linear feet of old/damaged corrugated metal pipe at 133 different locations ranging in pipe diameter from 10 to 180” using cured-in-place pipe (CIPP) lining and centrifugally-cast concrete pipe (CCCP) lining. An additional 5,800 linear feet of corrugated metal pipe repair was completed with the use of CIPP and CCCP through additive work.